When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
You can even opt to get 1/4" lines however I havent heard of anyone going so small.
yea, 1/4 is just too damn slow lol. I was about to drill out the 1/4 and rethread to 3/8
Originally Posted by rgarjr
Don't be surprise. Some dudes here have claimed they are running 1/4" inch lines to get more adjustment speed control.
With a good management system, it can adjust the speed by partially opening the valve while dumping, However, Im about to add a "tee" in the lines by the bags and add yet another set of dump valves (in addition to my 1/2's) for fine tuning so the "claims" are actually valid statements cause my 1/2's dump just to darn fast.
yea, 1/4 is just too damn slow lol. I was about to drill out the 1/4 and rethread to 3/8
With a good management system, it can adjust the speed by partially opening the valve while dumping, However, Im about to add a "tee" in the lines by the bags and add yet another set of dump valves (in addition to my 1/2's) for fine tuning so the "claims" are actually valid statements cause my 1/2's dump just to darn fast.
U need to grab the proper slowdowns Jokester.
Like the white one on the exhaust port of my manifold.
They have a screw that adjusts how much the valve is open so you can fine tune it to where you like it.
Oh, I know all my options. I dont want slow downs or else I would have gotten a 1/4" kit I want the speed (both up and down) for when people want a 'demo' of what it does, then the separate valves to level out to proper drive height.