Turbo Project
#21
Numbers, anywhere from 250+ ... after the manual tranny swap we'll probably go higher.
It's also gonna be running a water/alcohol injection system
for fuel, i'm getting a new walbro 255 fuel pump and a new regulator and either an SMT6 or greddy emange to handle everything.
It's also gonna be running a water/alcohol injection system
for fuel, i'm getting a new walbro 255 fuel pump and a new regulator and either an SMT6 or greddy emange to handle everything.
#25
Big update:
Mounted and welded up the intercooler and ziptied an RSX or TSX? lip to the bumper.
A couple of bolts and zipties later everything was back in place. The intercooler sits a little lower than I expected, but we're gonna raise it up a little and try to even it out a little.
Overall I'm happy with the progress.
New lip looks pretty cool too =P
So for now stage 1 which was the intercooler and some prep work is out of the way.
This weekend I have a few things non-turbo related to do to the car. Fix that new lip up some more, fix the fogs, rotate tires, and strip the other camry.
Stage 2 is gonna be the battery being moved and the turbo being set into place.
Stage 3 piping, flanges, lots of welding and fittings
Stage 4 ECU, tuning, misc. electronics, full inspection and monitoring.
Stage 5 New exhaust
Stage 6 FUN!
Updates for stage 2:
We've got some space for that dang turbo now!
I can't believe it.... Its actually about to go in!!!!!!!!!!!!
Mounted and welded up the intercooler and ziptied an RSX or TSX? lip to the bumper.
A couple of bolts and zipties later everything was back in place. The intercooler sits a little lower than I expected, but we're gonna raise it up a little and try to even it out a little.
Overall I'm happy with the progress.
New lip looks pretty cool too =P
So for now stage 1 which was the intercooler and some prep work is out of the way.
This weekend I have a few things non-turbo related to do to the car. Fix that new lip up some more, fix the fogs, rotate tires, and strip the other camry.
Stage 2 is gonna be the battery being moved and the turbo being set into place.
Stage 3 piping, flanges, lots of welding and fittings
Stage 4 ECU, tuning, misc. electronics, full inspection and monitoring.
Stage 5 New exhaust
Stage 6 FUN!
Updates for stage 2:
We've got some space for that dang turbo now!
I can't believe it.... Its actually about to go in!!!!!!!!!!!!