Busting my *** to in my free time to get ready for the BBQ! It's ALMOST there.
Most of the nitrous is wired up and plumbed now. Still gotta build the transmission computer and wire that in then wire the fuel pumps and install the drive shaft.
After that it should be ready to start....I hope. Exterior won't be painted in time but if mechanically it all works it'll be there.

Jon...keep that extra 2jZGTE TB for me. I still might need it
Most of the nitrous is wired up and plumbed now. Still gotta build the transmission computer and wire that in then wire the fuel pumps and install the drive shaft.
After that it should be ready to start....I hope. Exterior won't be painted in time but if mechanically it all works it'll be there.

Jon...keep that extra 2jZGTE TB for me. I still might need it
Lexus Fanatic
Happy to see you've made so much progress. Looking really clean as well. As for the TB still holding on to it for ya 



