PPE GS/LS/SC V8 header group buy
#125
Driver School Candidate
iTrader: (4)
Join Date: Mar 2010
Location: CA
Posts: 37
Likes: 0
Received 0 Likes
on
0 Posts
The GB ends today but I will extend it one more week. (It will end Sunday the 5th) If we can get 15 orders (we have 11 and maybe one more) then I will do 15% off.
We will be getting an SC430 in here to check fitment. So if the SC430 guys want to get in they can. It will just be a little longer wait for them to ship.
We will be getting an SC430 in here to check fitment. So if the SC430 guys want to get in they can. It will just be a little longer wait for them to ship.
i think the group buy is over though..
#127
Lexus Fanatic
iTrader: (182)
i would assume he's building them which is why we havent heard anything from him....
this was the last email he sent me on 12/7/10 (although i didnt send anything after that to him so no reason he would respond)
im sure you could PM him but i dunno if you will get a response quickly....i doubt he has much time to spend on the computer if he's building 20 sets of headers by hand
this was the last email he sent me on 12/7/10 (although i didnt send anything after that to him so no reason he would respond)
Originally Posted by PPEHeaders
Hey Brian,
We are starting production this week. We are cutting flanges and bending tube, then we will start assembly. They should start shipping in about 2 weeks (this includes coating which takes about a week or so depending on their schedule).
-Paul
We are starting production this week. We are cutting flanges and bending tube, then we will start assembly. They should start shipping in about 2 weeks (this includes coating which takes about a week or so depending on their schedule).
-Paul
im sure you could PM him but i dunno if you will get a response quickly....i doubt he has much time to spend on the computer if he's building 20 sets of headers by hand
Last edited by sakataj; 12-15-10 at 11:29 PM.