My 2GS project
#1
Driver School Candidate
Thread Starter
Join Date: Apr 2012
Location: Antwerp
Posts: 23
Likes: 0
Received 0 Likes
on
0 Posts
My 2GS project
Hello, my name is Stefan from Belgium.
After several years snooping around and gather informationon on this forum, it is time to propose my project.
To begin, my Lexus GS300 is built in 1998 and has 138,000 miles walked.
Almost 2 years ago i bought this Lexus GS300 to replace my Honda Accord.
Considering the age, ths car was in very good condition.
On the windscreen there was rust due to poor treatment by replacement and some small dents.
This has already happened:
- NewOEM front bumper
- OEM rear bumper
- Nev OEM headlights
- New windshield
- Many new OEM parts
- TTE front lip
- Cleaned frontbumper
- VS-KF Work Wheels 19x8.5 +16 and 19x9.5 +8
- Toyo Tires 215-35-19 and 225-35-19
- Viair Airride based on K-sport suspension
- Wheel edge rear modified to fit the wheels
- Facelift taillights
- Fully repainted in original color
On air without rear wheels, did not fit
After several years snooping around and gather informationon on this forum, it is time to propose my project.
To begin, my Lexus GS300 is built in 1998 and has 138,000 miles walked.
Almost 2 years ago i bought this Lexus GS300 to replace my Honda Accord.
Considering the age, ths car was in very good condition.
On the windscreen there was rust due to poor treatment by replacement and some small dents.
This has already happened:
- NewOEM front bumper
- OEM rear bumper
- Nev OEM headlights
- New windshield
- Many new OEM parts
- TTE front lip
- Cleaned frontbumper
- VS-KF Work Wheels 19x8.5 +16 and 19x9.5 +8
- Toyo Tires 215-35-19 and 225-35-19
- Viair Airride based on K-sport suspension
- Wheel edge rear modified to fit the wheels
- Facelift taillights
- Fully repainted in original color
On air without rear wheels, did not fit
Trending Topics
#14
Driver School Candidate
Thread Starter
Join Date: Apr 2012
Location: Antwerp
Posts: 23
Likes: 0
Received 0 Likes
on
0 Posts
Thanks guy's for the great comments
The further plans are a complete ice installation in the trunk and further clean up of the engine bay..., adjust some details, I still waiting for some parts that I ordered....
During construction, is nearly complete interior removed for cleaning.
Cleaned 50/50 parts
Also immediately placed the cables needed for ice
The air gauge in the center console and buttons is already in place
And jadu; the car is almost new, just the chasis
The further plans are a complete ice installation in the trunk and further clean up of the engine bay..., adjust some details, I still waiting for some parts that I ordered....
During construction, is nearly complete interior removed for cleaning.
Cleaned 50/50 parts
Also immediately placed the cables needed for ice
The air gauge in the center console and buttons is already in place
And jadu; the car is almost new, just the chasis