I am working on the brakes at the moment. For some reason, all the lines and calipers are fine, but the master reservoir is dry. I think it has to do with leaks in the TRAC system.
At this point, I'm ripping that out as well in it's entirety.
Oh and it's snowing 2 inches/hour in Maine right now..
I am working on the brakes at the moment. For some reason, all the lines and calipers are fine, but the master reservoir is dry. I think it has to do with leaks in the TRAC system.
At this point, I'm ripping that out as well in it's entirety.
Oh and it's snowing 2 inches/hour in Maine right now..
#20
Here is the $400 Chinese inverter TIG welder I am working with.
It works great. DC only, so aluminum is out till I get an AC machine, but no complaints!
It's a Giant Tech CAT 416D.
I couldn't find the 1jz Downpipe flange off the O2 housing, so I welded a pipe to it.
This little guy stuck to Cast without even pre-heating or putting a brush to it! I highly recommend them!
It works great. DC only, so aluminum is out till I get an AC machine, but no complaints!
It's a Giant Tech CAT 416D.
I couldn't find the 1jz Downpipe flange off the O2 housing, so I welded a pipe to it.
This little guy stuck to Cast without even pre-heating or putting a brush to it! I highly recommend them!
#29
Big last two days!
Pics soon.
I finished, after months of setbacks:
-Welded up a new muffler hanger bracket
-Got a P/S Line made up at a Hydraulic line shop
-Installed new P/S Headlight
-Converted to 6000k HIDs
-Installed The Intercooler
-Straightened the Radiator support, now Radiator sits in nice.
Now it needs:
-Windshield (Still..)
-4" downpipe extension, and weld the flange on
-Body Welding/Steel work
-Speedo/Tach/Auto Trans Cluster Wired up
-Weld up some Brackets for the new seats.
-Weld the Diff
There seems to be a lot of welding to do!
Pics soon.
I finished, after months of setbacks:
-Welded up a new muffler hanger bracket
-Got a P/S Line made up at a Hydraulic line shop
-Installed new P/S Headlight
-Converted to 6000k HIDs
-Installed The Intercooler
-Straightened the Radiator support, now Radiator sits in nice.
Now it needs:
-Windshield (Still..)
-4" downpipe extension, and weld the flange on
-Body Welding/Steel work
-Speedo/Tach/Auto Trans Cluster Wired up
-Weld up some Brackets for the new seats.
-Weld the Diff
There seems to be a lot of welding to do!